Insulation renewal, ball bearings on elecrtic motors replacement and opening of two access doors

The work that was performed during dry dock was:
1.Replacement of existing hot water insulation
 
Pipe Insulation before
Pipe insulation before
Pipe Insulation before
Pipe insulation before
 
Pipe Insulation renewed
Pipe insulation renewed
Pipe Insulation renewed
Pipe insulation renewed
 
2.Fabrication and installation of two inspection hatches for the cold water pipe in main galley
 
Inspection Hatch
Inspection Hatch
Inspection Hatch
Inspection Hatch
Inspection Hatches
 
3.Insulation renewal on chilled water lines
 
Inspection Hatch
Pipe condition before
Inspection Hatch
Pipe condition before
Inspection Hatch
Pipe insulation renewed
Inspection Hatch
Pipe insulation renewed
 
4.Ball bearings on main ER ventilation fans electric motors replacement
 
Electric Motor
Electric Motor
 
5.Fan bracket and motor bases of AHU replacement
 
Motor's base before
Motor's base previous condition
Motor's base before
Motor's base previous condition
Fabricated bracket
Fabricated bracket
Motor's base after
Motor's base after
 
Additional jobs that were requested during dry dock
1.Opening of two access doors/hatches
2.Ceiling reinforcement